|
Last Modified: 11-29-2007 |
1.6 A |
|
Service Category: Power Source/Network |
Section: Battery/Charging |
|
Model Year: 2008 |
Model: Sequoia |
Doc ID: RM000002BS200PX |
|
Title: 2UZ-FE BATTERY / CHARGING: GENERATOR: INSTALLATION (2008 Sequoia) |
INSTALLATION
1. INSTALL GENERATOR ASSEMBLY
|
(a) Install the generator assembly with the bolt and 2 nuts.
Torque: 39 N·m (398 kgf·cm, 29 ft·lbf)
Torque: 16 N·m (163 kgf·cm, 12 ft·lbf)
|
|
(b) Connect the generator connector.
|
(c) Connect the generator wire with the nut.
Torque: 9.8 N·m (100 kgf·cm, 87 in·lbf)
(d) Install the terminal cap.
(e) Install the harness bracket to the generator assembly with the bolt.
Torque: 8.2 N·m (84 kgf·cm, 73 in·lbf)
2. INSTALL VANE PUMP ASSEMBLY
3. INSTALL FAN AND GENERATOR V BELT
4. INSTALL AIR CLEANER HOSE ASSEMBLY
5. INSTALL THROTTLE BODY COVER SUB-ASSEMBLY
6. INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY
7. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected
.
|